California’s failed $2.2B Ivanpah solar power facility is shutting down

White Notch ReverseWhite Notch

(Sierra Daily News, September 24, 2025)

 

California’s failed $2.2B Ivanpah solar power facility is shutting down

California’s aggressive shift from nuclear power to mandated wind and solar energy has led to significant challenges in electricity reliability and cost. Since the 2006 passage of AB 32, which set ambitious greenhouse gas reduction goals, the state has experienced frequent power outages, partly due to the intermittent nature of renewable energy sources and the retirement of reliable nuclear plants like Diablo Canyon.

 

PGH Works Perspective

The facility “has struggled to meet energy production expectations and has had significant environmental impacts, including the annual incineration of thousands of birds.”

See More

Pittsburgh Works News Logo
Join Pittsburgh Works
Enter your email to receive the latest news:

CONTACT US

  • This field is for validation purposes and should be left unchanged.


Jeff Nobers | Executive Director | Jeff@pghworks.com
Ken Zapiniski | Director of Research and Public Policy | ken@pghworks.com
General Inquires: info@pghworks.com

631 Iron City Drive
Pittsburgh, PA 15205

Pittsburgh Works Together, Inc.
Copyright 2023 - All Rights Reserved
Privacy Policy